UP RVUNL – Ash Water Recovery System
Obra ‘C’ TPP, UP

UP RVUNL – Ash Water Recovery System  <br> Obra ‘C’ TPP, UP

UP RVUNL – Ash Water Recovery System
Obra ‘C’ TPP, UP

Percentage of ZECPL in the Project 100%
LOA/Order Date/ Date of Start of the Project 27.03.2023
Value of contract as per Agreement/ LOA 17.18
Employer's Contact (Address,Tel, Fax) "The Executive Engineer, Obra ‘C’ Civil Construction Circle-I, Obra ‘C’ Thermal Power Project, U.P. Rajya Vidyut Utpadan Nigam Ltd., Obra, Sonebhadra, UP – 231219 "
Present Status In Progress
State, in which project is executed Uttar Pradesh

Additional Make-up Water Piping Package for Khargone STPP (2×660 MW)

×